The Coventry project is new construction of a grades 9-12
High School to serve 735 students. The location of the new
school is the site of the pre-existing Erwine Intermediate
School. Due to the compact site, the abatement and
demolition of the middle school was included in the BSHM
services. The District’s competition football field as well as
practice football field and track are located on site and
remained in full operation duration of the demolition and
construction of the project.
The project was the OSFC’s first Design/Build new
construction project in the State and was recently featured at the 2014 OSFC Annual Conference due to the positive
collaborative effort by the Project Team members. The fast track nature of this Design/Build project required several
expedited bid packages and multiple GMP’s.